A Review Of End caps
Link Boxes with Svl , grounded at both of those ends with the cable route and installed pretty close to the cable conductors, to carry the fault current all through floor faults and also to Restrict the voltage rise on the sheath for the duration of floor faults to an appropriate degree.Picking out your required thread need not be a difficulty, as